1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project

Product Details
Customization: Available
After-sales Service: Video Technical Support, Online Support, Spare PAR
Warranty: 1 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Experienced Team
The supplier has 5 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
In-stock Capacity
The supplier has In-stock capacity
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
  • 1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
Find Similar Products
  • Overview
  • Specification
Overview

Basic Info.

Model NO.
FCS-ZL50HCG
Certification
TUV, ISO, RoHS, CE
Condition
New
Rated Load
3-6t
Transmission
Hydraulic - Mechanical
Load and Unload Mode
Front Discharge
Walking Mode
Wheeled
Type
Medium-sized Loader
Bucket Capacity
3.6m³
Rated Payload
5600kg
Operating Weight
18800±300kg
Traction Force
165±5kN
Breakout Force
160±5kN
Rated Power
162kw/2200rmpm
Maximum Torque
950n·m/1400-1600rpm
No. of Cylinders/Displacement
6/9.726L
Air Cleaner
Three Stage Air Cleaner
Alternator
70AMP
Battery
2-24V/120ah
Starting Motor
24V/7.5kw
Transmission Type
Planetary Powershift
Pressure of Transmission
1.2-1.5MPa
Differential
Conventional
Transport Package
Ude Package Payloader Machine
Specification
CE, ISO, EPA
Trademark
FOCUS
Origin
Shandong, China
HS Code
8429510000
Production Capacity
5000 Vehicle/Year

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
10.000kg

Product Description

Wheel  Loader
A loader is a heavy equipment machine used in construction to move or load materials such as soil, rock, sand, demolition debris, etc. into or onto another type of machinery (such as a dump truck, conveyor belt, feed-hopper, or railroad car).
There are many types of loader, which, depending on design and application, are variously called a bucket loader, end loader, front loader, front-end loader, payloader, high lift, scoop, shovel dozer, skid-steer, skip loader, tractor loader or wheel loader.
A loader is a type of tractor, usually wheeled, sometimes on tracks, that has a front-mounted wide bucket connected to the end of two booms (arms) to scoop up loose material from the ground, such as dirt, sand or gravel, and move it from one place to another without pushing the material across the ground. A loader is commonly used to move a stockpiled material from ground level and deposit it into an awaiting dump truck or into an open trench excavation.
The loader assembly may be a removable attachment or permanently mounted. Often the bucket can be replaced with other devices or tools—for example, many can mount forks to lift heavy pallets or shipping containers, and a hydraulically opening "clamshell" bucket allows a loader to act as a light dozer or scraper. The bucket can also be augmented with devices like a bale grappler for handling large bales of hay or straw.
Loaders are used mainly for loading materials into trucks, laying pipe, clearing rubble, and digging. A loader is not the most efficient machine for digging as it cannot dig very deep below the level of its wheels, like a backhoe or an excavator can. The capacity of a loader bucket can be anywhere from 0.5 to 36 m³ depending upon the size of the machine and its application. The front loader's bucket capacity is generally much bigger than a bucket capacity of a backhoe loader.
Unlike most bulldozers, most loaders are wheeled and not tracked, although track loaders are common. They are successful where sharp-edged materials in construction debris would damage rubber wheels, or where the ground is soft and muddy. Wheels provide better mobility and speed and do not damage paved roads as much as tracks, but provide less traction.
In construction areas loaders are also used to transport building materials such as bricks, pipe, metal bars, and digging tools over short distances.
Specification
LG876HS
Weichai Ⅲ+ZF Automatic Transmission
RATED POWER:199kW/2200rpm
BUCKET CAPACITY:5.2m³
RATED PAYLOAD:7000kg
OPERATING WEIGHT:23500(24300)±300kg
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
ZL50HCG
Weichai Ⅱ Pilot Control
RATED POWER:162kW/2200 rpm
BUCKET CAPACITY:3.0m³
RATED PAYLOAD:7000kg
OPERATING WEIGHT:17300±300kg
ZL50HCG
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
Weichai Ⅲ Pilot Control
RATED POWER:162kW/2200rpm
BUCKET CAPACITY:3.6m³
RATED PAYLOAD:5600kg
OPERATING WEIGHT:18800±300kg
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
LG833H-E
BUCKET CAPACITY:1.7m³
RATED PAYLOAD:3000kg
OPERATING WEIGHT:10200±300kg
LG866H-E
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
BUCKET CAPACITY:4.2m3
RATED PAYLOAD:6500kg
OPERATING WEIGHT: 21900±300kg
Technical Specifications
(If you need more models please contact me.)

FCS-LG866H-E
FCS-LG833H-E
FCS-LG856H-E
FCS-ZL50HCG
Bucket Capacity
4.2m³
1.7m³
3.2m³
3.6m³
Rated Payload
6500kg
3000kg
5500kg
5600kg
Operating Weight
21900±300kg
10200±300Kg
17800±300kg
18800±300Kg
Traction Force
195±5KN
95±5kN
165±5kN
165±5kN
Breakout Force
210±5KN
95±5kN
165±5kN
160±5kN
Maker/Model
CATL-LFP
CATL-LFP
CATL-LFP
WEICHAWVVP10G220E341
Rated Power
120kw
70kw
75kw
162kW/2200rpm
Maximum Torque



950N·m/1400-1600rpm
Bore x Stroke(mm)



126x130mm
No. of Cylinders/Displacement



6/9.726L
Air Cleaner



Three Stage Air Cleaner
Aiternator



70AmP
Battery



2-24V/120Ah
Starting Motor



24V/7.5kW
Transmission Type
Countershaft
Countershaft
Countershaft
Planetary Powershift
Shift Type
Electronic Powershift Control
Electronic Powershift Control
Electronic Powershift Control
Mechanical Powershift Control
Pressure of Transmission



1.2-1.5MPa
Torque Converter Type



Single-stage,Duo-turbine,4 element
Axles
Rigid (Front)&Oscillating (Rear)
Rigid (Front)&Oscillating (Rear)
Rigid (Front)&Oscillating(Rear)
Rigid (Front)&Oscillating (Rear)
Rear Axle Oscillation (°)
±8
±8
±8
±10
Differential
Conventional
Conventional
Conventional
Conventional
Main Reducer
Spiral Bevel,1-stage Reduction
Spiral Bevel, 1-stage Reduction
Spiral Bevel,1-stage Reduction
Spiral Bevel,1-stage Reduction
Setting Pressure
12 MPa
0.70-0.78MPa
12 MPa
0.70-0.78MPa
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
1-5m³ Construction Equipment Front Loader Wheel Loader for Infrastructure Project
About maintenance
During use, please pay attention to the following points:
1. Do not overload;
2. Whether the ground conditions allow use;
3. Load the cargo correctly;
4. Please wear safety shoes and gloves during operation;
5. Please do a thorough operation check before each use;
6. Use the correct lifting technique to assemble the machine;
7. Do not ignore the potential dangers that may exist during operation. During maintenance, mainly check the oil, remove the air and lubricate. It is recommended to check every six months. Special attention should be paid to the wheels, axles, handles, forks, lifting and lowering controls.
8. Whenever the work is completed, the forks should be unloaded and lowered to the lowest position.
Guiding
1.You please send us your enquiry;
2.We shall reply you with the quotation within 12 hours;
3.We negotiate on the configuration that you need;
4.Confirmation of the tech data → sign contract (P/I) → 30% deposit (or L/C issuing)→ production;
5.Manufacturing process updated news → completing production;
6.Balance payment → ex works → shipment → custom clearance → A/S service for 1 year.
Service Promise
1.  24-hours hot line at your service, available for quality and extending service.
2. Lifelong free technical guidance service can be provided.
3. For Customers who buy bulk quantity for the first time, we can send service technicians to offer site instruction service
    and short- term stationary point service.
4. Free technical training can be provided to help customers use and maintain the trucks and trailers quickly and correctly.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier